This project is applied to the data center of Yizhuang, a leading domestic Internet enterprise, which is the first case of evaporative cooling and direct expansion of the data center.
Application field: data center
Project situation: The project was completed in July 2018 and put into operation in September. The air-conditioning system has been running safely, stably, and trouble-free for 3 years. The average PUE of the computer room is <1.1.
There are six floors in the computer room. The outdoor unit is on the roof and the indoor unit is on the first floor. The backplane is supplied with air at 27°C. There are 24 cabinets, and a single cabinet has a load of 8kW.

 